DM 37/2008, Annex I

Declaration of conformity of the solar PV system.

The official Italian form, word for word as in the Official Gazette, to download in PDF and fill in. Below: what it contains, who signs it, the mandatory attachments and the filing deadline. The form itself is in Italian.

Download the form in PDF

Two pages: the form and the legend of the notes. Print it and fill it in; the dotted lines are the fields.

What the form contains

Four parts, one page.

  • The company and who signs

    The declarant, owner or legal representative; company name, registered office, VAT number and registration with the companies register or the register of craft businesses.

  • The system

    The description and the maximum committed power; whether it is a new system, a conversion, an extension or extraordinary maintenance; where it is and what the building is used for.

  • What it declares

    That the design was followed, the applicable technical standard was applied, components suited to the site were installed and the system was checked with a positive result.

  • Mandatory attachments

    The design, the report on the types of materials, the as-built diagram, the reference to previous declarations and the certificate of technical-professional requirements.

The rules

Who signs it, and by when.

  • Who issues itThe qualified installing company (art. 3), to the client, at the end of the works (art. 7). It is signed by the declarant and the technical manager.
  • FilingThe company files it with the municipality’s one-stop building office within 30 days of the end of the works (art. 11).
  • StandardsFor a low-voltage PV system, the ones Sunnix suggests, to be reviewed: Progettazione: Legge 186/1968; CEI 64-8 (Parte 7, Sezione 712); Guida CEI 82-25 (serie). Esecuzione: D.M. 37/2008; CEI 64-8; CEI 0-21 (connessione alla rete). Verifiche: CEI 64-8 (Parte 6); CEI EN 62446-1.
  • Above 20 kWSelf-generation falls under the decree up to 20 kW nominal (art. 2, paragraph 1, letter e), and a ground-mounted system only if it serves a building (art. 1). Beyond that, a declaration under law 186/1968, or one limited to the earthing system, is usually issued: there is no official form for it.

With Sunnix Pro

The declaration, from the system’s folder.

Once the system is installed, “Prepare the declaration” fills in the form with the data Sunnix already has: you check it and sign.

  • Your company’s and the signatory’s details, written once
  • The system and its power, from the folder
  • The materials report with the installed components, line by line
  • The suggested standards, to review and change

From €99 + VAT a month, up to 3 people. 7 days free, no card.

Questions about the declaration of conformity.

Can’t find the answer? Message us on WhatsApp

The installing company qualified under art. 3 of DM 37/2008, to the client, at the end of the works (art. 7). It is signed by the declarant, owner or legal representative, and by the technical manager.

Within 30 days of the end of the works, with the one-stop building office of the municipality where the system is (art. 11). The installing company files it.

The design (articles 5 and 7), the report on the types of materials used, the as-built diagram, the reference to previous or partial declarations of conformity and a copy of the certificate of technical-professional requirements.

Self-generation falls under DM 37/2008 up to 20 kW nominal, and a ground-mounted system only if it serves a building. Beyond that, a declaration under law 186/1968, or one limited to the earthing system, is usually issued: whoever signs decides case by case.

The PDF is the form to print and fill in. In Sunnix Pro the declaration is filled in from the system’s folder and downloaded ready to sign.